March 2003 (Volume 9, Number 1)

A Blocking Flowshop Scheduling Problem with Material Handling Constraint
– Tapan P. Bagchi, Sanjeewa Naranpanawe, Chelliah Sriskandarajah
 
Partial Deadlock Detection in Automated Flexible Manufacturing Cells
– Ali Yalcin
 
Supply Chain Information Technology Metrics Cells
– Jack C. Hayya, Dean C. Chatfield, Xin(James) He, Chao-Hsien Chu
 
Model and Heuristics for Lot Streaming of One Job in M-1 Hybrid Flowshops
– Wei Zhang, Jiyin Liu, Richard J. Linn
 
Simulated Annealing for Solving a Manufacturing Batch-Sizing Problem
– Ruhul Sarker, Xin Yao